Bonshaw Energy Park

 The Project is located in Bonshaw, NSW, which is 347km away from Brisbane and 693km from Sydney. GAIA Australia is the Developer of 100MW Bonshaw solar PV Farm Project in NSW. Grid Connection is on track with TransGrid and PPA is under discussion with local retailers. Financial closing is expected to be set arounD Q4 2023.

​Location

  • Lot 2 DP 1039185, Bonshaw, NSW 2361

  • Site Entry Point Coordinates, Latitude  29°11’22.38"S / Longitude 151°20’27.70”E

  • Distance from Sydney 693km, from Brisbane 347km

  • Journey : Sydney airport →  Moree airport (1:35 hrs), Airport to site (2:30 hrs)

Screen Shot 2021-10-18 at 4.55.51 pm.png

Development Stages

  • Stage 1 : 100MW PV

  • Stage 1a : 50MW PV

  • Stage 2 : 150MW BESS

  • Stage 3 : 150MW PV (DA_Dec.2024)

  • Stage 4 : 500MW BESS (DA_Sep.2024)